Installation Guides
Professional installation resources for every product we supply — downloadable PDFs, step-by-step video tutorials, and technical data sheets.
PDF Guides
7 guides
Detailed printable installation documents you can take on site.
Video Tutorials
3 videos
Watch real installations performed by experienced fitters.
Technical Data Sheets
Available on request
Product specifications, fire ratings, and compliance certificates.
All Guides
Browse by category and download the resources you need.
ACP Panel Installation
ACP Panel System Overview
Complete guide covering panel system components, terminology, and pre-installation checklist for aluminium composite panels.
Fixing & Mechanical Fastening
Step-by-step instructions for routing, bending, and mechanically fixing ACP panels to steel and timber sub-frames.
ACP Cladding — Full Installation Walkthrough
End-to-end video demonstration of a facade cladding installation, from sub-frame setup to finished panel alignment.
Trim & Edge Finishing
Corner & Edge Trim Application
Demonstrates how to correctly cut, mitre, and apply aluminium corner trims for a clean professional finish.
Silicone Sealing & Weather Joints
Guidance on selecting the correct silicone grade, applying consistent beads, and tooling joints for weathertight performance.
Adhesive & Bonding
Panel Adhesive Application Guide
Coverage rates, open times, and application methods for structural panel adhesives used with ACP and dibond products.
Double-Sided Tape Bonding
Video guide showing correct surface preparation, tape positioning, and pressure application for tape-bonded signage panels.
General Preparation
Surface & Substrate Preparation
How to assess, clean, and prime substrates to ensure optimal adhesion and long-term panel performance.
Measuring, Marking & Setting Out
Professional setting-out techniques including level lines, datum points, and tolerance allowances for large-format installations.
Professional Installation Tips
Key principles our team recommends before every installation.
Measure Twice, Cut Once
Always double-check dimensions before cutting. Allow for thermal expansion gaps of at least 3 mm on each panel edge when installing in exposed exterior locations.
Prepare Your Substrate
Remove all dust, grease, and loose material before bonding or fixing. A properly prepared substrate is the single most important factor in long-term adhesion.
Respect Temperature Limits
Do not apply adhesives or sealants below 5 °C or above 35 °C. Cold conditions significantly extend cure times and can compromise bond strength.
Use the Right Tools
ACP panels should be cut with carbide-tipped saw blades. Using incorrect tools creates rough edges, delamination, and voids any product warranty.
Follow the Guide Sequence
Installation guides are written in a deliberate order. Skipping steps — especially priming and dry-fit checks — is the leading cause of rework on site.
Store Materials Correctly
Store panels flat on a level surface, away from direct sunlight and moisture. Stack protective film side up and avoid point loads that can cause permanent marking.
Safety Information
Important safety requirements for all installation work.
Read all safety notes before starting work
Failure to follow safe working practices may result in injury to yourself or others, and may void product warranties. If in doubt, consult a qualified installation professional.
Personal Protective Equipment
- Safety glasses or goggles when cutting
- Gloves when handling sheet edges
- Dust mask when routing or sanding
- Hard hat on any elevated work platform
Ventilation & Environment
- Ensure good airflow when using adhesives
- Do not apply solvents near open flames
- Work in dry conditions — avoid rain or frost
- Store adhesives away from heat sources
Tools & Equipment
- Inspect power tools before each use
- Keep cutting blades sharp and clean
- Secure panels before cutting or drilling
- Follow COSHH guidance for all chemicals
